Building: Our Services

BUILDING

Follow the plan

The actual construction process follows the agreement closely and includes payment for completed work after every stage. How many stages the agreement includes depends a little on the size of the project. Here are the main ones, that can be combined on smaller projects.

20200228_133134_HDR_edited.jpg

FRAME

Includes foundation beams

Raising of the frame, and installing the foundation beams that the frame stands on. The frame is created in our workshop beforehand.

OUTER SHELL

Windboards all around

I-Beams are placed around the frame, that makes up the insulation space. Windboards are then placed all around the house, also over doors and windows.

ROOF

Watertight

First the airspace is created (10cm), then boards and then the sheet metal. Coverboards and gutters too.

talo-malli.jpg

WINDOWS

And doors

Openings for the windows and doors are made and windows installed. The main door is left to last, to avoid damage.

CLADDING

Finishes outside

An air space is created outside the windboards and cladding is finished. Depending on the time of year, sometimes this has to be done later.

INSULATION

Airtight on the inside

Paper is installed on the inside of the studs, and insulation is blown into the created space.

maxresdefault.jpg

INSIDE WALLS

Technical stage one

The inner surfaces of the walls are installed (but not finished). Electric and water that runs in these walls are installed.

STUD WALLS

Technical stage two

Inner stud walls are created and all the electric and water installed and run into the floor.

HEATING

Technical three

Any water tanks and heating system pipes are installed. Also, final water and electric connections made.

20200312_142606.jpg
keys-hand-over--1024x683.jpg

BATHROOM

Technical four

Bathrooms and toilet are finalized, including water sealing and tiles.

FINAL SURFACES

Floors and ceilings

After the final plumbing is finished the floor insulation is blown. All surfaces are finished, usually the floor last.

FINISH

Everything done

After the last final touches and cleaning, the building officials do a final check. The house is ready to be lived in.

Off course the stages sometimes overlap a bit. But payment is only due when the stage is completed.
Changes to the plan, after the agreement is made, require agreement and may result in charges.